When our client called us to rectify a water problem at the exit from the Port of Brisbane Cruise Liner terminal it was holding around 20mm of water and people weren't happy to walk through it. The tricky asphalt job was over 40m2 and we only had 5mm of fall to work with, if that, but we accepted the challenge.
We first set our levels to best divert the water. This was time consuming but well worth it as the finished job sucessfully solved the problem.
If you have a tricky asphalt job please give us a call - we would love to help you!
March 21st 2013